How it's worked out
- Area: 30 × 30 = 900 sq ft
- Volume: 900 sq ft × 4 in ÷ 12 = 300 cu ft
- Add 10%: 300 × 1.1 = 330 cu ft
- Cubic yards: 330 ÷ 27 = 12.22 yd³
- 80 lb bags: 330 ÷ 0.6 cu ft per bag = 550 bags
30x30 slab at other thicknesses
| Thickness | Cubic yards | 80 lb bags | 60 lb bags |
|---|---|---|---|
| 4 in | 12.22 | 550 | 734 |
| 5 in | 15.28 | 688 | 917 |
| 6 in | 18.33 | 825 | 1100 |
4 inches suits patios, sheds and walkways. Driveways and garage floors usually get 5 to 6 inches.
What a 30x30 slab costs
Concrete for a 4 inch 30 × 30 slab costs about $3,025–$4,400 in 80 lb bags, or $1,956–$2,689 as ready-mix.
| Item | Amount | Typical price | Cost |
|---|---|---|---|
| 80 lb bags | 550 bags | $5.50–$8 each | $3,025–$4,400 |
| Or order ready-mix | Amount | Typical price | Cost |
|---|---|---|---|
| Ready-mix concrete | 12.22 yd³ | $160–$220 per yd³ | $1,956–$2,689 |
Typical US prices before tax and delivery, checked October 2026. Prices vary by region and brand, so type your own into the calculator above for an exact total. Ready-mix suppliers often add a short-load fee for orders under about 4 to 5 yards. Forms, gravel base, rebar or wire mesh, and tool rental are extra.
At 12.22 yards, ready-mix delivery is usually cheaper and much less work than mixing 550 bags by hand. Most suppliers deliver in quarter or half yard steps, so round up when you order.
Other common sizes
- 4 × 4 ft
- 10 × 10 ft
- 10 × 12 ft
- 10 × 20 ft
- 12 × 12 ft
- 12 × 16 ft
- 12 × 20 ft
- 12 × 24 ft
- 16 × 16 ft
- 20 × 20 ft
- 20 × 24 ft
- 24 × 24 ft
- 30 × 30 ft
- 30 × 40 ft
More detail: How Many Bags of Concrete Do I Need? (Chart + Examples)