How Much Gravel for a 12x100 Driveway?

A 12 × 100 ft driveway with a 4 inch layer of gravel needs 14.81 cubic yards, which is about 20.7 tons. Order roughly 10% more to allow for compaction.

Change any number below to match your project. The gravel calculator works for any size.

Area shape

Enter your measurements to see the result.

How it's worked out

  1. Volume: 12 × 100 × 4 in ÷ 12 = 400 cu ft
  2. Cubic yards: 400 ÷ 27 = 14.81 yd³
  3. Tons: 14.81 × 1.4 tons per yard = 20.7 tons

12x100 driveway at other depths

DepthCubic yardsTons (approx.)With 10% extra
2 in7.4110.411.4
4 in14.8120.722.8
6 in22.2231.134.2

A new driveway is usually built in layers: 4 to 6 inches of large crushed stone for the base, then 2 to 3 inches of smaller top stone. Refreshing an existing driveway takes about 2 inches. The 1.4 tons per yard figure is typical for gravel; ask your supplier for theirs.