How Much Gravel for a 20x50 Driveway?

A 20 × 50 ft driveway with a 4 inch layer of gravel needs 12.35 cubic yards, which is about 17.3 tons. Order roughly 10% more to allow for compaction.

Change any number below to match your project. The gravel calculator works for any size.

Area shape
Blank uses a typical price range.

Your shopping list prints here.Enter your measurements and it updates as you type.

How it's worked out

  1. Volume: 20 × 50 × 4 in ÷ 12 = 333.3 cu ft
  2. Cubic yards: 333.3 ÷ 27 = 12.35 yd³
  3. Tons: 12.35 × 1.4 tons per yard = 17.3 tons

20x50 driveway at other depths

DepthCubic yardsTons (approx.)With 10% extra
2 in6.178.69.5
4 in12.3517.319
6 in18.5225.928.5

What gravel for a 20x50 driveway costs

At 4 inches deep with 10% extra, the gravel costs about $760–$1,426 in bulk, before the delivery fee.

ItemAmountTypical priceCost
Gravel, bulk19 tons$40–$75 per ton$760–$1,426

Typical US prices before tax and delivery, checked October 2026. Prices vary by region and brand, so type your own into the calculator above for an exact total. Most suppliers add a delivery fee per load. Landscape fabric and edging are extra.

A new driveway is usually built in layers: 4 to 6 inches of large crushed stone for the base, then 2 to 3 inches of smaller top stone. Refreshing an existing driveway takes about 2 inches. The 1.4 tons per yard figure is typical for gravel; ask your supplier for theirs.