Quick answer

Gravel is the cheapest driveway by far. Asphalt and plain concrete cost about the same to install, but concrete lasts about twice as long. For a typical 12 × 50 ft one-car driveway, expect about $900 to $2,400 for gravel, $3,000 to $7,800 for asphalt and $3,600 to $6,000 for concrete, installed. If you're doing the work yourself, the gravel, asphalt and concrete calculators tell you exactly how much to order for your size.

Open the gravel calculator

Side by side

GravelAsphaltConcrete
Installed, per sq ft$1.50 to $4$5 to $13$6 to $10
Typical life10 to 15 years15 to 30 years30 to 50 years
Regular upkeepRake, regrade and top up stone every 1 to 3 yearsSeal 6 months after paving, then every 3 to 5 yearsOptional sealing; fill cracks as they appear
Can you DIY it?Yes, with a rented plate compactorNo, hot mix needs a paving crew and rollerSmall pads yes; a full driveway is a crew job
Best forLong, rural or sloped driveways and tight budgetsCold climates and snow plowingLong-term value, hot climates, heavy vehicles

Installed prices are typical US ranges from published cost guides, checked October 2026. Your area, site access, slope and soil all move the price, so get two or three local quotes.

How much material each one takes

This is what you'd order for a new driveway. Gravel is 6 inches (4 inches of base stone plus 2 inches of top stone) with 10% extra for compaction. Asphalt is 3 inches compacted on a 6 inch crushed stone base. Concrete is a 4 inch slab with 10% extra, on a 4 inch base.

DrivewayGravelAsphaltConcrete
12 × 24 ft
Short one-car
8.2 tons5.5 tons + 8.6 tons base3.9 yd + 5.7 tons base
12 × 50 ft
One-car driveway
17.1 tons11.4 tons + 17.9 tons base8.1 yd + 11.9 tons base
24 × 24 ft
Two-car, short
16.4 tons11.0 tons + 17.2 tons base7.8 yd + 11.4 tons base
20 × 40 ft
Two-car driveway
22.8 tons15.2 tons + 23.9 tons base10.9 yd + 15.9 tons base
12 × 100 ft
Long rural driveway
34.2 tons22.8 tons + 35.8 tons base16.3 yd + 23.9 tons base

Every option needs the base. Asphalt and concrete only last as long as the compacted stone under them, which is why a cheap paving job that skips it often cracks within a few winters.

What each driveway costs by size

The big number is a typical installed price. The small line underneath is just the materials at October 2026 prices, before delivery fees, so you can see how much of a quote is labor and equipment.

DrivewayGravelAsphaltConcrete
12 × 24 ft$430 to $1,150
materials $330 to $620
$1,450 to $3,750
materials $890 to $1,750
$1,750 to $2,900
materials $850 to $1,300
12 × 50 ft$900 to $2,400
materials $680 to $1,300
$3,000 to $7,800
materials $1,850 to $3,650
$3,600 to $6,000
materials $1,800 to $2,700
24 × 24 ft$860 to $2,300
materials $660 to $1,250
$2,900 to $7,500
materials $1,800 to $3,500
$3,450 to $5,750
materials $1,700 to $2,600
20 × 40 ft$1,200 to $3,200
materials $910 to $1,700
$4,000 to $10,400
materials $2,500 to $4,850
$4,800 to $8,000
materials $2,350 to $3,600
12 × 100 ft$1,800 to $4,800
materials $1,350 to $2,550
$6,000 to $15,600
materials $3,700 to $7,250
$7,200 to $12,000
materials $3,550 to $5,350

Two things stand out. First, stone is a big share of a gravel quote, so doing it yourself saves less than you might think: mostly the spreading, compacting and equipment rental. Second, labor is roughly half of an asphalt or concrete job, and on small driveways the minimum charge for a crew, a ready-mix truck or an asphalt plant load pushes the price per square foot up.

Taking out an old driveway first adds about $1 to $2 per sq ft for asphalt, and more for thick or reinforced concrete.

Cost per year of use

A cheaper driveway that needs replacing twice as often isn't always the bargain it looks. Spread over its typical life, the 12 × 50 ft driveway works out like this:

DrivewayInstalledLastsPer year of life
Gravel$900 to $2,40010 to 15 years$60 to $240
Asphalt$3,000 to $7,80015 to 30 years$100 to $520
Concrete$3,600 to $6,00030 to 50 years$70 to $200

Gravel still wins on cost, but it needs the most attention. Topping up that driveway with 2 inches of fresh stone takes about 5.2 tons, or $210 to $390 in stone, every few years. A contractor typically charges $0.25 to $1 per sq ft for the same job. Per year of life, concrete often comes out cheaper than asphalt, and asphalt also needs resealing every 3 to 5 years. Concrete needs little more than the odd crack filled.

Which driveway should you choose?

Choose gravel if

  • The driveway is long. On a 100 ft rural drive, the gap between gravel and paving runs into thousands of dollars.
  • You want to do the work yourself, or you need a driveway now and plan to pave later. A well-built gravel driveway makes a good base for asphalt.
  • Drainage matters. Water soaks through gravel instead of running off, and some towns limit paved (impervious) area.

Skip it on steep slopes where stone washes out, and if you need to shovel snow: plows and shovels throw stone into the lawn.

Choose asphalt if

  • You live somewhere with hard winters. Asphalt flexes a little with freeze and thaw, road salt doesn't damage it the way it scales concrete, and the dark surface melts snow faster.
  • Your local asphalt quotes come in below concrete. National ranges overlap, so get a quote for each and compare.
  • You need it usable fast: you can usually drive on new asphalt in 2 to 3 days, against about a week for concrete.

In hot climates asphalt can soften and rut, and kickstands or trailer jacks can dent it on summer days.

Choose concrete if

  • You plan to stay for decades. It has the longest life and the least upkeep of the three.
  • You park heavy vehicles, like a truck, RV or boat trailer. Go to 5 or 6 inches thick with rebar.
  • You live somewhere hot, where its light color stays cooler underfoot.

In cold climates, ask for air-entrained concrete and avoid salting it for the first winter. Stains from oil and rust show more on concrete than on asphalt.

Next steps

Quick answers for common sizes